I have a group project that I need done as it is due next week. Now the unfortunate thing is its not even close to being done now becuase while I have been doing all of it, it’s a group project. So where is the group? Well they aren’t there to say the least. I’m leading, heck spoon feeding them what I need done. I’ve done 80% I just need that other 20 from them, but that hasn’t happened and none of them even showed up for the last inclass meeting so that we could pull things together. Not one. If this was the real world they would be fired. As it is I now have to burn every once of oil I don’t have. Create a power point presentation, a Photoshop flier, 6 drawn models, two story boards, an actual waist coat, on top of doing 4 other final projects for other classes.
I bark big sometimes but this is for sure, while I will not be unproffessional I will also not let them stand and present with me next week. They did nothing, saddled me with everything, and for that they will share no modecrum of my hard labor. I don;t usually do this but I will give them a stern dressing down, in the most profeesional way I know how if they for one moment try to claim any responsibility for the presentation I put together. I can work in a group just fine when the group can follow orders and pull weight. If that group can’t do that I will cut them loose and stand on my owe. So be it.








